November 12, 2019: Successfully organized a seminar introducing the application of GE’s products in Digital Substations, with the participation of various units under EVN (Vietnam Electricity).
Digital Subtation
Digital substations represent an inevitable trend in the digital transformation and development of the power sector globally—and in Vietnam in particular.
A digital substation is a type of substation that employs optoelectronic technology to convert measurement, control, status, and alarm signals primary equipment located outdoors (at the intermediate cabinet or device level) digital signals. These signals are transmitted via converter units and fiber optic systems to relay/BCU devices installed in protection and control panels within the central control room.
The transmission and reception of data outdoor devices to the control center are fully digitized using the IEC 61850-9-2 Process Bus technology.

Digital devices ensure self-monitoring and diagnostic capabilities,
minimizing incidents caused by copper cable failures.
Reduce construction, installation, and testing time. Minimize power outage duration during system upgrades, expansions, equipment replacement, and maintenance.
Reduce the volume of materials and labor required for construction, installation, wiring, testing, and maintenance.
Fiber optic data transmission facilitates future scalability and easy expansion of the substation.
Copper cables are replaced with safer fiber optic cables, helping to minimize the risk of electrical short circuits.
Enhancing aesthetics in design, construction, and operation.
January 10, 2020: Successfully commissioned Power Transformer T2 – 110kV Que Vo 2 Substation, the first project in Vietnam to apply IEC 61850-9-2 Process Bus technology.
Successful Energization of Projects:
-
February 8, 2021: 110kV Nghi Son Substation – the first fully digital substation at the 110kV level in Vietnam’s power grid.
-
July 25, 2021: Power Transformer T2 – 110kV Hung Nguyen Substation
-
August 3, 2021: Power Transformer T2 – 110kV Cai Lan Substation
-
September 25, 2021: 220kV Substation – IALE 1 Wind Power Plant
Successful Energization of Projects:
-
January 2022: 110kV Phung Xa Substation
-
July 2022: Power Transformer T2 – 110kV Dak Song Substation
-
December 4, 2022: Power Transformer T2 – 110kV Quang Chau 2 Substation
January 2023: Successfully energized the 110kV Phu Ha Substation